- JST - https://www.jungmann.de/en -

The centralisation of several control stations into one central control room or master control room

There are many reasons to merge and centralise control stations into a central control room. The main reason: a central control room where ALL systems can be controlled and monitored.

Compared to satellite measuring stations, consolidation can lead to numerous improvements. Be it more reliability during critical situations, pleasant acoustics and air conditioning through computer relocation, screen-friendly lighting, back-friendly ergonomics according to the baua Study or user-friendliness – everything functions reliably according to the latest standards and with cutting-edge technology. The company is also ultimately well positioned for demographic change. This is what makes JST impressive right across the board.

OFFER CENTRALISATION
Control Centre Centralisation with JST Jungmann
InfraLeuna - Logo
  • Efficient control of all systems in the central control room
  • Optimal spatial distance of workplaces
  • Improved communication through centralisation
  • Reduction of monitors in the control center
  • Reduced reaction times and excellent ease of use
  • Preparation for demographic change
PCK - Logo

Practical examples: Merging of control rooms

Anyone who plans to merge several distributed control centers into one control center needs an experienced partner like JST Systemtechnik. Together we will analyse all of the advantages and possible disadvantages and work out a customised solution. The goals of centralisation include maximum transparency, short reaction times, reliable teamwork and direct coordination. Our reference projects will demonstrate how we have already met these challenges with flying colours.

We will be happy to put you in touch with the appropriate contact person.

New central control room for InfraLeuna

“You can concentrate on your core business, we will design and develop the framework conditions for your production.” With this company philosophy, InfraLeuna GmbH – the operator of the infrastructure facilities at the Leuna chemical site – strives to provide its customers at the Leuna chemical site with all necessary services at reasonable prices and in high quality. This also includes the execution of extensive modernisation work. Among which includes the installation of a new central control room. InfraLeuna was supported in this construction project by specialists from Jungmann Systemtechnik.

JST References - InfraLeuna - Happy Project Managers
A gesture that says it all: With thumbs up, the Project Managers in charge are sending a clear message about the new central control room.

Jochen Rösner / Mark Muschick / Eberhard Schoof (from left to right)

The Project Managers in charge

JST-Control Station-Infraleuna-Leuna

Planning and installation of the new control room for the cement plant

It was a long way from the old mosaic picture technique to the presentation of all processes on the modern large display wall. With the support of the experts from Jungmann Systemtechnik, the Spenner Zement company was able to open its doors to technical progress in control technology. Four distributed operating and control stations were combined into a modern control room at the company headquarters in Erwitte, North Rhine-Westphalia.

JST References - Spenner Cement: Production Manager Dr. Heinrich Sievers
"The whole package was really coherent, and we also really liked the dedication of the Jungmann employees."

Dr. Heinrich Sievers

Production Manager

Renewed control room for PCK refinery

PCK Raffinerie GmbH in Schwedt/Oder is one of the top companies in Brandenburg and the most important company in the Uckermark. Around 12 million tonnes of crude oil are processed into petroleum and petrochemical products in Schwedt every year. The main products are diesel, petrol, kerosene, liquefied petroleum gas, heating oils and bitumen. PCK was one of the first refineries in Germany to use biofuels and is itself a major producer of high-quality biofuel components.

JST - PCK Schwedt: Control room project managers are very happy
"Compared to the satellite measuring stations and also to the old central measuring station, we have been able to improve in every aspect, be it acoustics, lighting, air conditioning, ergonomics or user-friendliness".

Eric Sieger, Thomas Taube, Carsten Jungmann (from left to right)

Chief Divisional Engineer for Processing (PCK) / Divisional Engineer for Maintenance Service and Project Coordinator (PCK) / Managing Director (JST)

JST-PCK-control-room

JST product overview: Think of everything!

Centralise control centers with the following components

JST product overview: Think of everything!

Centralise control centers with the following components



Was möchten Sie als Nächstes tun?

Ich möchte

We are happy to answer your questions control center centralisation

+49 4161 54044-0

You are currently viewing a placeholder content from Youtube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information