Lord of the tracks: Duty controllers in operations control centers for electronic interlocking control centers for railway control the networks at the click of a mouse

In rail transport, around 40,000 trains run on German rails every day.
This bustling activity is planned, controlled and monitored by the traffic controller in the electronic rail interlocking control centers, the control center for the railway interlocking.
This is how rail traffic can run safely.
Preferably trouble-free.
A total of 3,000 interlocking control centers of all types are entrusted with responsible tasks.

Today, modern electronic interlocking control centers (ESTW) have significantly improved operations management for the train dispatcher.
JST offers state-of-the-art technology that is precisely adapted to the planning and optimization of the interlocking’s control center.
With our specially developed JST Profi-Tools we give the dispatcher the best support in 24/7 operation.

OFFER ELECTRONIC SIGNAL BOX RAILWAY
Electronic interlocking control centers and operations center interlocking control centers Railway interlocking control centers from JST Jungmann
  • Everything in view: monitor walls for the 24/7 operation
  • Comprehensive: baua study, professional association, VBG, escape routes
  • Optimal: pleasant working atmosphere, suitable design

Practical examples: Electronic interlocking control centers railway

Jungmann Systemtechnik with its team of experts is the ideal partner for the planning, modernization and implementation of control centers and electronic interlocking control centers (ETSW) for railways.
Already in the early planning phase, JST considers all decisive components such as ergonomics, viewing angle, lighting, furniture, technology and software, infrastructure and the adaptation of existing systems and networks.
In the electronic interlocking control centers, successful establishment ultimately also includes successful human communication.
In our reference projects we show you how this composition can look like after project completion.

We will be happy to put you in touch with the respective contact person.

New control center for traffic monitoring with monitor wall and flexible control

Rush hour traffic in the city.
The streets are full and commuters gather at the local transport stops.
If a bus breaks down now, it’s gonna be tight.
In the event of breakdowns or delays, everything depends on the control center in the university town of Göttingen.
There, ideal technical conditions for traffic monitoring have now been created in favor of reaction time.
With products from JST, the employees of the Göttinger Verkehrsbetriebe GmbH keep the overview.

JST - Göttinger Verkehrsbetriebe: Project Managers are happy
Praise from traffic master Ricardo Mecke: "I have never worked with someone so professionally before. From the first meeting to the installation, everything went perfectly."

Thomas Zimmermann / Ricardo Mecke / Dr. Jens Conrad (from left)

Operations manager / traffic master / administrator

JST - Göttinger Verkehrsbetriebe: Operator workstations in front of the large display wall

New traffic control center is the heart of the subway

“We have proven that Berlin construction projects can be completed on time and without increasing costs,” says Antje Michalak, responsible for the “Control Centers 2014+” project of Berliner Verkehrsbetriebe, which includes the new operations control center for the subway (BLU).
This new building project with a total budget of 8.9 million euros was also supported by Jungmann Systemtechnik.
170 employees control the train traffic around the clock from the heart of the Lichtenberg underground.

JST References - Berliner Verkehrsbetriebe: Project Manager happy with JST's work
"We have built a perfect control center here."

Lars Kramer (left) / Antje Michalak / Matthias Borgwald (right)

Subproject manager IT technology / overall project manager / subnetwork manager

New control room for more safety in operating processes

Whether simulated extreme conditions or realistic prerequisites – hardware and software of railway systems from Siemens are thoroughly inspected in the Wegberg-Wildenrath Test and Validation Center.
A track system over 30 kilometers long is available there.
Static and dynamic tests are performed on vehicles and systems 365 days a year.
A task that requires a perfectly equipped control room for monitoring.
With the assistance of the experts from Jungmann Systemtechnik a control room could be realized, which meets all requirements.

JST - Siemens Wegberg: Project Manager Dirk Wienforth praises the new control room
"The new technology is an enormous relief for the colleagues. Especially the reduction of monitors creates a much better overview."

Dirk Wienforth

Project manager

JST-Siemens Wegberg: Control centre with large display wall and operator table

JST product overview: Think of everything!

Setting up the electronic interlocking for railways with the appropriate components

JST product overview: Think of everything!

Setting up the electronic interlocking for railways with the appropriate components



Was möchten Sie als Nächstes tun?

Ich möchte

We will be happy to answer your questions on the subject of electronic railway interlocking